Our Work Experience

16 January 2015
Category:
Jasuma News
No. Client Project Name Contract Value Date
01 PT. Indonesia Power UBP Suralaya Procurement Cold and Hot Air Heater Element Unit # 5 and Procurement Cold Air Heater Element with layers enamel unit # 5 Suralaya Steam Power Plant. $ 455.874,00 September, 2014
02 PT. Berkat Bima Sentana Transport Services 4 x MAN Diesel 18V48/60TS and its equipment from the port of Belawan to Belawan Power Plant (on Engine Foundation/Lay Down Area Belawan Power Plant) $ 700.000,00 November, 2013
03 PT. Berkat Bima Sentana Commissioning Services PLTD Belawan Engine 8 x MAN 9L58/64. $ 74.000.00 August, 2013
04 PT. PLN (Persero) Papua & West Papua Region Rehabilitation of Wartsila 18V32 SN 5606 Waena Power Plant. $ 1.696.819,63 July, 2013
05 PT. Berkat Bima Sentana Installation and Fabrication Pipe Steam Boiler Work Engine MAN 9L58/64 and MAN 18V48/60TS Belawan Power Plant $ 75.000,00 July, 2013
06 PT. Berkat Bima Sentana Design & Engineering Diesel Work Belawan Power Plant $ 95.000,00 July, 2013
07 PT. Berkat Bima Sentana Transport Services 9 x MAN Diesel 9L58/64 and its equipment from the port of Belawan to Belawan Power Plant (on Engine Foundation/Lay Down Area Belawan Power Plant) $ 790.000,00 May, 2013
08 PT. Berkat Bima Sentana Project & Site Management Belawan Power Plant $ 210.000,00 April, 2013
09 PT. PLN (Persero) East Kalimantan Region Major Overhaul of Mirrlees Blackstone KV12 Major Diesel Engine Kledang Power Plant. $ 1.939.813,65 February, 2013
10 PT. Berkat Bima Sentana Installation of Diesel Engines and Generators 8 Units x Engine MAN 9L58/64 and 4 Units x MAN 18V48/60TS Belawan Power Plant $ 1.100.000,00 February, 2013
11 PT. PLN (Persero) West Kalimantan Region Rehabilitation of 2 Unit Sulzer Type 12V40/48 (2×6,4 MW) Siantan Power Plant. $ 5.479.612,70 September, 2012
12 PT. Mirlindo Padu Kencana Regrouting Project Mirrlees Blackstone KV12 Major Merawang. $ 19.800,00 September, 2012
13 PT. Wijaya Karya Mechanical Electrical Installation HFO Power Plant, 4 x 6 MW Hative Kecil Power Plant Ambon. $ 485.000,00 Augusts, 2012
14 PT. PLN (Persero) North Sumatera Region Turnkey EPC 120 MW HFO Belawan Power Plant. $ 138.203.366,40 March, 2012
15 Indonesia National Army headquarters debriefing Agency Purchase agreement between the Indonesian Indonesia National Army commander was represented by the Head of Indonesia National Army Debriefing Agency with PT. Jasuma Austindo. $ 77.773,00 November, 2011
16 PT. Berkat Manunggal Jaya Inland Transport of 6 Unit Diesel Genset New Sulzer 16ZA40S Complete with its auxilliaries to Tallasa Power Plant. $ 415.000,00 October, 2011
17 Joint Operation PT. Wijaya Karya – PT. Mirlindo Padu Kencana Operation Maintenance MFO 55 MW Pesanggaran Power Plant (8 years). $ 3.455.777,95 Augusts, 2011
18 PT. Berkat Manunggal Jaya Relocation of 6 Unit Diesel Genset New Sulzer 16ZA40S Complete with its auxiliaries from Shanghai Dongguan Shatian, China to South Sulawesi Indonesia. $ 349.500,00 June, 2011
19 CV. Cahaya Barito Procurement Connecting Rod Head, Two Part for Reliability Engine Sulzer type: 12ZAV40S Serie: 740248 Ampenan Power Plant. $ 13.520,00 September, 2010
20 PT. Mirlindo Padu Kencana Relocation of MIRRLEES BLACKSTONE KV12 MAJOR SN. 852401 Diesel Engine from Sukamerindu Power Plant – Bengkulu to Suak Power Plant – Blangpidie Aceh. $ 23.800,00 Augusts, 2010