No. |
Client |
Project Name |
Contract Value |
Date |
01 |
PT. Indonesia Power UBP Suralaya |
Procurement Cold and Hot Air Heater Element Unit # 5 and Procurement Cold Air Heater Element with layers enamel unit # 5 Suralaya Steam Power Plant. |
$ 455.874,00 |
September, 2014 |
02 |
PT. Berkat Bima Sentana |
Transport Services 4 x MAN Diesel 18V48/60TS and its equipment from the port of Belawan to Belawan Power Plant (on Engine Foundation/Lay Down Area Belawan Power Plant) |
$ 700.000,00 |
November, 2013 |
03 |
PT. Berkat Bima Sentana |
Commissioning Services PLTD Belawan Engine 8 x MAN 9L58/64. |
$ 74.000.00 |
August, 2013 |
04 |
PT. PLN (Persero) Papua & West Papua Region |
Rehabilitation of Wartsila 18V32 SN 5606 Waena Power Plant. |
$ 1.696.819,63 |
July, 2013 |
05 |
PT. Berkat Bima Sentana |
Installation and Fabrication Pipe Steam Boiler Work Engine MAN 9L58/64 and MAN 18V48/60TS Belawan Power Plant |
$ 75.000,00 |
July, 2013 |
06 |
PT. Berkat Bima Sentana |
Design & Engineering Diesel Work Belawan Power Plant |
$ 95.000,00 |
July, 2013 |
07 |
PT. Berkat Bima Sentana |
Transport Services 9 x MAN Diesel 9L58/64 and its equipment from the port of Belawan to Belawan Power Plant (on Engine Foundation/Lay Down Area Belawan Power Plant) |
$ 790.000,00 |
May, 2013 |
08 |
PT. Berkat Bima Sentana |
Project & Site Management Belawan Power Plant |
$ 210.000,00 |
April, 2013 |
09 |
PT. PLN (Persero) East Kalimantan Region |
Major Overhaul of Mirrlees Blackstone KV12 Major Diesel Engine Kledang Power Plant. |
$ 1.939.813,65 |
February, 2013 |
10 |
PT. Berkat Bima Sentana |
Installation of Diesel Engines and Generators 8 Units x Engine MAN 9L58/64 and 4 Units x MAN 18V48/60TS Belawan Power Plant |
$ 1.100.000,00 |
February, 2013 |
11 |
PT. PLN (Persero) West Kalimantan Region |
Rehabilitation of 2 Unit Sulzer Type 12V40/48 (2×6,4 MW) Siantan Power Plant. |
$ 5.479.612,70 |
September, 2012 |
12 |
PT. Mirlindo Padu Kencana |
Regrouting Project Mirrlees Blackstone KV12 Major Merawang. |
$ 19.800,00 |
September, 2012 |
13 |
PT. Wijaya Karya |
Mechanical Electrical Installation HFO Power Plant, 4 x 6 MW Hative Kecil Power Plant Ambon. |
$ 485.000,00 |
Augusts, 2012 |
14 |
PT. PLN (Persero) North Sumatera Region |
Turnkey EPC 120 MW HFO Belawan Power Plant. |
$ 138.203.366,40 |
March, 2012 |
15 |
Indonesia National Army headquarters debriefing Agency |
Purchase agreement between the Indonesian Indonesia National Army commander was represented by the Head of Indonesia National Army Debriefing Agency with PT. Jasuma Austindo. |
$ 77.773,00 |
November, 2011 |
16 |
PT. Berkat Manunggal Jaya |
Inland Transport of 6 Unit Diesel Genset New Sulzer 16ZA40S Complete with its auxilliaries to Tallasa Power Plant. |
$ 415.000,00 |
October, 2011 |
17 |
Joint Operation PT. Wijaya Karya – PT. Mirlindo Padu Kencana |
Operation Maintenance MFO 55 MW Pesanggaran Power Plant (8 years). |
$ 3.455.777,95 |
Augusts, 2011 |
18 |
PT. Berkat Manunggal Jaya |
Relocation of 6 Unit Diesel Genset New Sulzer 16ZA40S Complete with its auxiliaries from Shanghai Dongguan Shatian, China to South Sulawesi Indonesia. |
$ 349.500,00 |
June, 2011 |
19 |
CV. Cahaya Barito |
Procurement Connecting Rod Head, Two Part for Reliability Engine Sulzer type: 12ZAV40S Serie: 740248 Ampenan Power Plant. |
$ 13.520,00 |
September, 2010 |
20 |
PT. Mirlindo Padu Kencana |
Relocation of MIRRLEES BLACKSTONE KV12 MAJOR SN. 852401 Diesel Engine from Sukamerindu Power Plant – Bengkulu to Suak Power Plant – Blangpidie Aceh. |
$ 23.800,00 |
Augusts, 2010 |